Wisconsin · Masonry
Wisconsin Masonry Government Bids
Open masonry bid opportunities from Wisconsin government agencies. 73 open right now. Jobs & Bids checks the Midwest sources we monitor throughout the day, so you can browse them free. With Basic or Pro, we email you the masonry bids that match your trade, each with a plain-English summary so you know in 30 seconds if it's worth bidding.
Browse masonry bids free, no card required →
-
Paving Work - Wisconsin
Public agency · Closes Jul 28, 2026 · by end of day CTThe document requests sealed bids for paving work including concrete pavement, asphaltic concrete pavement, concrete walks, driveways, curb and gutter, pavement removal and... -
Concrete Repairs at Merrill Burn Tower NTC Campus
Northcentral Technical College · Wausau, WI · Closes Jul 28, 2026 · by end of day CTNorthcentral Technical College wants concrete contractors to repair deteriorated and damaged concrete at the Burn Tower. Repairs must follow ACI and ICRI 310.1r standards. -
Fair Park Pavilion Roof Replacement Project
Washington County, WI · West Bend, WI · Closes Jul 28, 2026 · by end of day CTReplace the existing gravel surfaced built-up roof system and overlay select areas of standing seam metal panels on the Washington County Fair Park Pavilion Building. The work... -
Asphalt Repairs at NEW Zoo
Public agency · Closes Jul 29, 2026 · by end of day CTPerform asphalt repairs at the NEW Zoo. The work involves repairing and maintaining asphalt surfaces. -
Asphalt Repairs at NEW Zoo
Brown County Purchasing · Green Bay, WI · Closes Jul 29, 2026 · by end of day CT -
Sealcoating & Striping in Wisconsin 326,855 SF
Public agency · Closes Jul 29, 2026 · by end of day CTProvide sealcoating and striping services covering approximately 326,855 square feet across 3 separate locations in Wisconsin. -
Lake Poynan Boat Ramp Replacement
Public agency · Closes Jul 29, 2026 · by end of day CTReplace boat ramps at a boat landing. The work includes all labor, equipment, and materials for the replacement. -
Lake Poygan Boat Ramp Replacement
Winnebago County · Oshkosh, WI · Closes Jul 29, 2026 · by end of day CTReplace the boat ramps at the Lake Poygan Boat Landing. -
Biobasin Stormwater Channel Repair at Willows
City of Madison · Madison, WI · Closes Jul 30, 2026 · 2:00 PM CTInstall an equalizer stormwater channel between two existing bioretention basins. The work includes grading, erosion control, removal of existing storm sewer, topsoiling,... -
Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
City of Madison · Madison, WI · Closes Jul 30, 2026 · 2:00 PM CTBuild a pedestrian-bike bridge over Starkweather Creek. The work includes excavation, storm sewer installation, asphalt pavement, concrete sidewalks, retaining walls, and... -
Overture Center Garage Electrical Upgrade
City of Madison · Madison, WI · Closes Jul 30, 2026 · 2:00 PM CTUpgrade the electrical system at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, and... -
Concrete Pavement Reconstruction with Curb and Gutter, ADA Ramps, Traffic Calming and Grading
Public agency · Closes Jul 30, 2026 · by end of day CTThe project involves concrete pavement reconstruction, installation of curb and gutter, ADA ramps, traffic calming features, and grading work in Wisconsin. -
Concrete Pavement Reconstruct and Asphalt Resurfacing with Sidewalks in Wisconsin
Public agency · Closes Jul 30, 2026 · by end of day CTPerform concrete pavement reconstruct, asphalt pavement resurfacing, curb and gutter, sidewalk, driveway approaches, and green infrastructure work in Wisconsin. The work... -
Arrip and Culvert Replacement
Public agency · Closes Jul 30, 2026 · by end of day CTA road improvement project involving major culvert replacement, pavement pulverization, bituminous milling and paving. Work is scheduled for calendar years 2026 and 2027. -
Transfer Station Pavement Improvements at Columbia County Solid Waste, W7465 Hwy 16, Pardeeville, WI
Columbia County · Portage, WI · Closes Jul 30, 2026 · by end of day CTPerform pavement improvements at its transfer station located at W7465 Hwy 16, Pardeeville, WI 53954. -
Paving New Parking Lot with Asphalt Maintenance Services
Public agency · Closes Jul 30, 2026 · by end of day CTProvide asphalt maintenance services including seal coating, hot-mix asphalt patching, and crack sealing. -
Courthouse Curb and Gutter Repairs
Public agency · Closes Jul 30, 2026 · by end of day CTPerform curb and gutter repairs at a courthouse. The work involves repairing and replacing curb and gutter systems. -
2026 Street Surface Treatment
Public agency · Closes Jul 30, 2026 · by end of day CTPerform street surface treatment work in Wisconsin. The project involves the application of surface treatments to roads and highways. -
Cutting and Patching Pavement in Parking Lot
Public agency · Closes Jul 30, 2026 · by end of day CTCut and patch pavement in a parking lot. The work includes sawcutting curb, grading for drainage, and asphalt pavement installation. -
Seal and Coat Courthouse Parking Lot
Public agency · Closes Jul 30, 2026 · by end of day CTSeal and coat a courthouse parking lot with hot-mix asphalt paving, asphalt emulsion sealing with flexibility additives, and painted pavement markings including handicap... -
Cutting and Patching Curb and Gutter
Public agency · Closes Jul 30, 2026 · by end of day CTPerform cutting and patching of curb and gutter. The work is located in Wisconsin. -
Adelaide Park Baseball Diamond Fencing
City of Fond du Lac · Fond Du Lac, WI · Closes Jul 30, 2026 · by end of day CTRemove existing fence and install new chain link fencing at Adelaide Park Baseball Diamond. The work includes installing various heights of fencing and gates. -
UW-Parkside Stormwater Management Improvements
Public agency · Closes Jul 30, 2026 · by end of day CTStormwater Management Improvement services. The work includes site clearing, demolition, earthwork, excavation, and utility management with comprehensive construction requirements. -
Asphalt Resurfacing and Overlay with Protected Bike Lanes
Public agency · Closes Aug 4, 2026 · by end of day CTThe project involves roadway improvements including pavement removal and installation, concrete curb and gutter work, sidewalk and driveway construction, stormwater drainage... -
S. 49TH Street Improvements Project
Public agency · Closes Aug 5, 2026 · by end of day CTPerform street improvements involving pavement milling, concrete base repair, curb and gutter work, storm sewer repairs, street lighting replacement, and pavement marking. The... -
2026 Crack Sealing Program
Public agency · Closes Aug 5, 2026 · by end of day CTThe project involves furnishing all materials and completing crack sealing work with approximately 136,204 square yards of crack cleaning and sealing. -
73rd Street & 21st Avenue Resurfacing
Public agency · Closes Aug 5, 2026 · by end of day CTResurface 73rd Street and 21st Avenue. The work includes milling asphalt and concrete pavement, replacing storm inlets, manholes, and lateral pipes, removing and replacing... -
South 49th Street Improvements Project
Public agency · Closes Aug 5, 2026 · by end of day CTThe project involves street improvements including pavement milling, concrete base repair, curb and gutter work, storm sewer repairs, street lighting replacement, and pavement... -
Hot Mix Asphalt and Pulverizing Services for Wisconsin Road Project
Public agency · Closes Aug 5, 2026 · by end of day CTThe procurement involves the purchase of 900 tons of 4LT Hot Mix Asphalt material and 8,900 square yards of pulverizing services for a road project in Wisconsin. -
Milling and Hot Mix Asphalt Purchase for County Road Project
Public agency · Closes Aug 5, 2026 · by end of day CTThe Highway Department wants sealed bids for hot mix asphalt materials and milling services for a county road project. Materials will be loaded onto department trucks for... -
Alexander Field - South Wood County Airport - Terminal Building Reconstruction
WisDOT Bureau of Aeronautics · Closes Aug 6, 2026 · 2:00 PM CTReconstruct Terminal Building -
Street Resurfacing Project: 45 City Blocks
Public agency · Closes Aug 6, 2026 · by end of day CTResurface approximately 45 city blocks across 21 road segments. All necessary labor, materials, tools, and equipment are required. -
Oak Leaf Trail Access Ramp
Public agency · Closes Aug 6, 2026 · by end of day CTConstruct a 10-foot-wide asphalt access ramp with 3-foot shoulders between a roadway intersection and an existing trail. The work includes grading, base aggregate, retaining... -
Safe Routes to School Pedestrian Sidewalk
Public agency · Closes Aug 6, 2026 · by end of day CTThe project involves constructing erosion control, grading, storm sewer systems, culvert work, concrete curb ramps, sidewalks, asphaltic surface, RRFB systems, permanent... -
Repair Airfield Lighting System at Volk Field CRTC
W7N8 Uspfo Activity Wiang Crtc (Dept of Defense) · Camp Douglas, WI, Federal · Closes Aug 7, 2026 · 4:00 PM CTRepair the airfield lighting system at Volk Field Air National Guard Base. The project includes installing specific equipment and may include optional line items. -
Concrete Slab and Repair Work – Forestry Shop
Public agency · Closes Aug 7, 2026 · by end of day CTInstall concrete slabs for fuel tanks and perform concrete repair work at a forestry shop. The work includes crash barrier installation, floor drain system, and heavy-duty... -
Klinkner Park Pickleball Courts with Acrylic Surfacing
Public agency · Closes Aug 7, 2026 · by end of day CTImprove Klinkner Park with concrete pickleball courts, acrylic surfacing, electrical and lighting systems, sidewalk and base course installation, amenity placement, erosion... -
Structure Replacement and Pavement Work on I-490
Wisconsin DOT · Sauk County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves removals, grading, aggregate, asphalt pavement, structure replacement, curb and gutter, beam guard, erosion control, permanent signing, traffic control,... -
Removals Grading Aggregate Asphalt Pavement Curb and Gutter
Wisconsin DOT · Rock County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves removals, grading, aggregate, asphalt pavement, curb and gutter, erosion control, permanent signing, traffic control, pavement marking, and restoration.... -
Removals, Milling, Grading, Aggregate, Asphalt Pavement, (Proposal 004)
Wisconsin DOT · Richland County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe work involves removals, milling, grading, aggregate, asphalt pavement, structure rehabilitation, culvert pipe, curb and gutter, concrete sidewalk, beam guard, erosion... -
Asphalt Pavement Removals Milling Grading Aggregate Structure Replacement
Wisconsin DOT · Vernon County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves asphalt paving work including removals, milling, grading, aggregate, and pavement. Key scope includes structure replacement and rehabilitation, culvert... -
Structure Replacement with Asphalt Pavement and Erosion Control
Wisconsin DOT · Dane County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves Removals, Grading, Aggregate, Asphalt Pavement, Structure Replacement, Erosion Control, Permanent Signing, Traffic Control, and Restoration. Work type: Structures -
Concrete Pavement, Grading, Milling, Removals, Storm Sewer, Traffic Signals
Wisconsin DOT · Dane County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves various construction tasks including removals, milling, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm... -
Structure Replacement Grading Aggregate Asphalt Pavement
Wisconsin DOT · Monroe County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves grading, aggregate, asphalt pavement, structure replacement, erosion control, permanent signing, traffic control, and restoration. Work type is structures. -
Concrete Pavement, Grading, Milling, Removals, Asphalt Pavement, Storm Sewer
Wisconsin DOT · Walworth, Waukesha Counties, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves various construction tasks including removals, milling, grading, aggregate, concrete pavement, asphalt pavement, structure replacement, rehabilitation,... -
Concrete Paving, Removals, Grading, Aggregate, Asphalt Pavement, Structure Rehabilitation
Wisconsin DOT · Brown County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves removals, grading, aggregate, concrete paving, asphalt pavement, structure rehabilitation, curb and gutter, storm sewer, beam guard, erosion control,... -
Asphalt Pavement Rehabilitation and Structure Work
Wisconsin DOT · Brown County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves rehabilitation of structures, including culvert pipes, sign structures, curbs, gutters, sidewalks, storm sewers, and traffic control systems. Work includes... -
Structure Replacement Grading Aggregate Asphalt Pavement
Wisconsin DOT · Calumet County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves grading, aggregate, asphalt pavement, structure replacement, erosion control, permanent signing, traffic control, and restoration. Work type is structures. -
Removals Grading Aggregate Concrete Pavement Asphalt Pavement
Wisconsin DOT · Outagamie County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves removals, grading, aggregate, concrete pavement, asphalt pavement, culvert pipe, curb and gutter, concrete sidewalk, storm sewer, erosion control,... -
Removals Grading Aggregate Concrete Pavement Asphalt Pavement
Wisconsin DOT · Marathon County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves removals, grading, aggregate, concrete pavement, asphalt pavement, culvert pipe, curb and gutter, erosion control, traffic control, pavement marking, and... -
Asphalt Paving, Culvert Pipe, and Erosion Control
Wisconsin DOT · Portage County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves Removals, Grading, Aggregate, Asphalt Pavement, Culvert Pipe, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Pavement Marking, Traffic... -
Asphalt Paving: Removals, Pulverizing, Grading, Aggregate, Pavement Marking
Wisconsin DOT · Green Lake County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe work involves removals, pulverizing, grading, aggregate, asphalt pavement, culvert pipe, erosion control, permanent signing, traffic control, pavement marking, and... -
Asphalt Pavement Removals Milling Grading Aggregate Structure Replacement
Wisconsin DOT · Marathon, Portage Counties, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves asphalt paving work including removals, milling, grading, aggregate, and pavement. Key scope includes structure replacement, culvert pipe, curb and gutter,... -
Concrete Pavement, Grading, Milling, Removals, Asphalt Pavement, Culvert Pipe
Wisconsin DOT · Waupaca County, WI · Closes Aug 11, 2026 · 11:00 AM CTThe project involves various construction tasks including removals, milling, grading, aggregate, concrete pavement, asphalt pavement, structure replacement, culvert pipe, curb... -
Asylum Bay Shoreline Restoration
Public agency · Closes Aug 11, 2026 · by end of day CTPerform shoreline restoration at a park and lighthouse facility. The work involves marine construction and landscaping. -
Bridge Structure Work on Lewis Road over Sugar River Bridge
Public agency · Closes Aug 11, 2026 · by end of day CTThe project involves excavation, base aggregate, asphaltic surface installation, structure removal over waterway, riprap, geotextile fabric, bridge structure work, erosion... -
C Edgerton Gear Dr/Tower Dr/Artisan Marshview Ct to W Fulton St
Public agency · Closes Aug 11, 2026 · by end of day CTPerform excavation, base aggregates, concrete curb and gutter, HMA pavement, permanent pavement marking, and signing. All incidental items necessary to complete the work are required. -
Roadway Construction: Plover - Waupaca, Maple Drive to I-39
Public agency · Closes Aug 11, 2026 · by end of day CTPerform roadway construction work including removal of existing infrastructure, excavation, base aggregate installation, and concrete pavement replacement. -
Mud Creek Bridge Replacement, T Stockbridge, Lakeshore Drive
Public agency · Closes Aug 11, 2026 · by end of day CTRemove an existing structure, construct a new bridge, and perform grading, base work, asphaltic surfacing, erosion control, and landscaping. The work includes bridge... -
Rudolph - Knowlton Oak Hill Road to CTH Db Pavement & Structure Work
Public agency · Closes Aug 11, 2026 · by end of day CTThe project involves clearing and grubbing, asphalt removal, excavation, base aggregate installation, HMA pavement, structure work, culvert pipes, concrete curb and gutter,... -
STH 33 - CTH W (CTH X) Bridge Repair
Public agency · Closes Aug 11, 2026 · by end of day CTPerform excavation, base aggregate installation, asphaltic surfacing, curb and gutter work, structure removal and construction, and erosion control for a bridge in Wisconsin.... -
Road Construction and Rehabilitation Viroqua - Richland Center STH 131 to Fancy Creek
Public agency · Closes Aug 11, 2026 · by end of day CTPerform comprehensive road construction and rehabilitation work including grading, asphalt milling and paving, drainage systems, concrete work, guardrail installation, and... -
IH 43 Rock Freeway Pavement and Guardrail Replacement from STH 20 to STH 83
Public agency · Closes Aug 11, 2026 · by end of day CTPerform work on or within 50 feet of railroad right-of-way, including pavement, guardrail, pipe, and fence removal and replacement, along with grading, restoration, and bridge... -
Bridge Reconstruction Lagrange Ellsworth Road Mill Creek Bridge
Public agency · Closes Aug 11, 2026 · by end of day CTReconstruct a bridge including structure removal, excavation, concrete masonry, steel reinforcement, and installation of protective treatments and tubular railing. -
Manitowoc - Green Bay STH 172 Atkinson Drive Pavement Repair
Public agency · Closes Aug 11, 2026 · by end of day CTPerform continuous reinforced concrete pavement repair, SMA and HMA paving, culvert repairs, beam guard installation, median cable barrier work, grading, pavement marking, and... -
Appleton - Black Creek CTH S Intersection
Public agency · Closes Aug 11, 2026 · by end of day CTPerform excavation, pavement installation, concrete work, storm sewer systems, culverts, lighting, and pavement marking at Black Creek, CTH S Intersection. All necessary... -
Abbotsford - Wausau CTH E South to STH 97 Highway Construction
Public agency · Closes Aug 11, 2026 · by end of day CTPerform highway construction work including pavement removal, excavation, crushed material, base aggregate, concrete and HMA pavement, curb and gutter, marking, traffic... -
Culvert Replacement on Sandberg Road
Public agency · Closes Aug 12, 2026 · by end of day CTReplace culverts on Sandberg Road. Work includes culvert installation, backfilling, compacting, seeding, and gravel base with new asphalt. -
Culvert Replacement with Gravel Base
Public agency · Closes Aug 12, 2026 · by end of day CTA lump sum bid is requested for culvert replacement project including work zone signing, culvert installation, backfilling, compacting, seeding, and gravel base installation. -
2026 Ho-Chunk Transportation Authority Road Chip Seal Projects
Public agency · Closes Aug 12, 2026 · by end of day CTApply single chip seal on three roads in Wisconsin. The work includes filling dips, edge cracks, and cross cracks before applying liquid asphalt and 3/8 inch washed fractured... -
Oconto River Bridge Redeck with Prefabricated Decking Panels
Oconto County · Oconto, WI · Closes Aug 12, 2026 · by end of day CTThe project involves removal of existing handrails and decking down to bridge girders. Installation of prefabricated decking panels and handrails as specified in bridge... -
Roof Repair and Security Door Installation, Building B512
W7N8 Uspfo Activity Wiang 128 (Dept of Defense) · WI, Federal · Closes Aug 13, 2026 · 2:00 PM CTRepair and replace the roof and install security doors at Building B512. The project includes replacing approx. 23,100 SF of built-up roofing with a 90-mil EPDM system, R-30... -
Frisbee Golf Course and Grills Concrete Work at Wyona County Park
Columbia County · Portage, WI · Closes Aug 27, 2026 · by end of day CTColumbia County wants concrete work for a nine-hole frisbee golf course and three new grills at Wyona County Park. The work requires installing concrete for the course and grills.
Masonry bids by area in Wisconsin
Madison (5)Green Bay (3)Appleton (1)Waukesha (1)
Other trades in Wisconsin
HVACPlumbingElectricalRoofingGeneral Construction
Government bids in other states
IllinoisIowaIndianaOhioKansasMichiganMinnesotaMissouriSouth DakotaNorth DakotaNebraska
Bids are aggregated from public government notices across Wisconsin; always verify the deadline with the issuing agency before bidding.